9. Metrics
13 Articles
- 9.1 Annualized Cost Savings - ATS Standard
- 9.2 CONC - Eaton Sites Only
- 9.3 How do Tasks with the Proactive toggle affect the CONC metric for Eaton sites?
- 9.4 "The Big 5"
- 9.5 Tech Utilization - ATS Standard
- 9.6 OSHA Lost Time Rate
- 9.7 OSHA Recordable Rate
- 9.8 Backlog - ATS Standard
- 9.9 Planned
- 9.10 PLANNING WIZARD: What do I have to do to have a task be included in my "Planned" Metrics?
- 9.11 What are some best practices to help increase my planned metric?
- 9.12 Average Time to Plan
- 9.13 Voice of Customer