3. P/S FUNCTIONS IN THE PORTAL
12 Articles
- 3.1 CONTROL CENTER: Is there an Overview of setting up Events/Alerts in the Control Center?
- 3.2 CONTROL CENTER: How do I create an Event Notification in the Control Center?
- 3.3 How can my Techs find their work assigned to a Team?
- 3.4 CONTROL CENTER: How do I enter a Production Schedule in the Work Module?
- 3.5 CONTROL CENTER: How do I make a Sub-Location INACTIVE at my site?
- 3.6 CONTROL CENTER: How do I create a new Sub-Location for my site?
- 3.7 When does it make sense to work in the Work Module vs. Planner Portal?
- 3.8 What is the best way to see my PMs that are due by today?
- 3.9 Is there an easy way to see all Open PM Tasks that are marked Regulatory?
- 3.10 When would I check the Event Log for a Work Order in the Work Module?
- 3.11 How can I see all the Job Plans associated with my site?
- 3.12 How can I see what Job Plan Number the generated Work Order/Task is associated to?