eFactoryPro Wiki

Existing Bugs in EFP Production Update

Updated on

Work Module

68361 - Work Module - Hold Work Order is not changed to Completed status when the task(s) associated is/are completed.

Tentative Release Date:  (Unknown)

Tentative Release Date:  (Unknown)

98626 - Scheduling Period Start Date should be able to start 6 days in the past

Tentative Release Date:  11/26/24

98634 - When adding more scheduling periods for a Container the new Start Scheduling period has the same date when the previous SP is finished.

Tentative Release Date:  11/26/24

98783 - Credit Terms not updating when a supplier is changed.

Tentative Release Date:  (Unknown)

100825 - Work Module- The Part Search screen is displayed loading when a commodity group and equipment is selected.

Tentative Release Date:  11/12/24

100887 - Work Module- The Job Plan screen is not loading equipment for site 211.

Tentative Release Date:  (Unknown)

99320 - Planner/Scheduler - When adding or editing a job plan the old text is overlapping in the history tab of the Edit Job Plan screen.

Tentative Release Date:  (Unknown)

99957 - Planner/Scheduler - The Job Plan grid is not updating correctly when the job plan has a Sublocation and when adding equipment to a Job Plan.

Tentative Release Date:  (Unknown)

100545 - Planner/Scheduler - Error 422 is displaying when editing a Job Plan copied by the Job Plan that has decommissioned equipment.

Tentative Release Date:  (Unknown)

100568 - Planner/Scheduler - Displayed data is overlapping on the Job Plan Summary screen.

Tentative Release Date:  (Unknown)

100904 - Planner Scheduler- The event event label is not displayed under the number 7 of the Edit Job Job Plan screen.

Tentative Release Date:  (Unknown)

100469 - PM Plans - When creating the first scheduled compliance finish date beyond March 9, 2025, the system is rolling it back one day upon saving.

Tentative Release Date:  (Unknown)

100646 - PM Plans - When filtering the Period Capacity "To Be Scheduled" the PM generated is not displaying as "Y"

Tentative Release Date:  (Unknown)

100799 - PM Plans - The compliance start date is changed a day less for all PMs generated after October 23rd.

Tentative Release Date:  11/12/24

Other

83792 - Integrations - When updating Serialized field in MDS parts, flag is not integrated to IFS.

Tentative Release Date:  (Investigating)

86102 - SSRS - Work Order Report information is displayed on 2 pages when printed.

Tentative Release Date:  (Unknown)

98626 - Control Center - The scheduling period start date is only allowing the current date and future dates to be selected. The correct setting is to allow a scheduling period to start 6 days in the past.

Tentative Release Date:  (Blocked)

98634 - Control Center - When adding more scheduling periods for a Container, the new Start Scheduling period has the same start date as the previous scheduling periods end date.

Tentative Release Date:  (Blocked)

D365

98230 - Field Service - Tech transfers from eFS to FMS did not have bookable resource records created in Field Service.

Tentative Release Date:  (Unknown)

Previous Article 1/10/2022
Next Article What process does the Quality Team use to Investigate a bug?