Work Module
68361 - Work Module - Hold Work Order is not changed to Completed status when the task(s) associated is/are completed.
Tentative Release Date: (Unknown)
92869 - Work Module - The Work Order screen should be using the count of Work Orders that are in open or hold status instead of the number of tasks related to open or hold Work Orders.
Tentative Release Date: (Unknown)
98626 - Scheduling Period Start Date should be able to start 6 days in the past
Tentative Release Date: 11/26/24
98634 - When adding more scheduling periods for a Container the new Start Scheduling period has the same date when the previous SP is finished.
Tentative Release Date: 11/26/24
98783 - Credit Terms not updating when a supplier is changed.
Tentative Release Date: (Unknown)
100825 - Work Module- The Part Search screen is displayed loading when a commodity group and equipment is selected.
Tentative Release Date: 11/12/24
100887 - Work Module- The Job Plan screen is not loading equipment for site 211.
Tentative Release Date: (Unknown)
99320 - Planner/Scheduler - When adding or editing a job plan the old text is overlapping in the history tab of the Edit Job Plan screen.
Tentative Release Date: (Unknown)
99957 - Planner/Scheduler - The Job Plan grid is not updating correctly when the job plan has a Sublocation and when adding equipment to a Job Plan.
Tentative Release Date: (Unknown)
100545 - Planner/Scheduler - Error 422 is displaying when editing a Job Plan copied by the Job Plan that has decommissioned equipment.
Tentative Release Date: (Unknown)
100568 - Planner/Scheduler - Displayed data is overlapping on the Job Plan Summary screen.
Tentative Release Date: (Unknown)
100904 - Planner Scheduler- The event event label is not displayed under the number 7 of the Edit Job Job Plan screen.
Tentative Release Date: (Unknown)
100469 - PM Plans - When creating the first scheduled compliance finish date beyond March 9, 2025, the system is rolling it back one day upon saving.
Tentative Release Date: (Unknown)
100646 - PM Plans - When filtering the Period Capacity "To Be Scheduled" the PM generated is not displaying as "Y"
Tentative Release Date: (Unknown)
100799 - PM Plans - The compliance start date is changed a day less for all PMs generated after October 23rd.
Tentative Release Date: 11/12/24
Other
83792 - Integrations - When updating Serialized field in MDS parts, flag is not integrated to IFS.
Tentative Release Date: (Investigating)
86102 - SSRS - Work Order Report information is displayed on 2 pages when printed.
Tentative Release Date: (Unknown)
98626 - Control Center - The scheduling period start date is only allowing the current date and future dates to be selected. The correct setting is to allow a scheduling period to start 6 days in the past.
Tentative Release Date: (Blocked)
98634 - Control Center - When adding more scheduling periods for a Container, the new Start Scheduling period has the same start date as the previous scheduling periods end date.
Tentative Release Date: (Blocked)
D365
98230 - Field Service - Tech transfers from eFS to FMS did not have bookable resource records created in Field Service.
Tentative Release Date: (Unknown)