eFactoryPro Wiki

2.7 As a Purchasing Supervisor, how do I change a Goods and Services PO from Received Full to Received Partial?

Updated on

Steps in the screenshots correspond to the numbers in the headings.

Anyone with the Purchasing Supervisor Role, as well as those with advanced admin rights (Admin, IT App Support, IT Ops Support) have a button that allows GNS lines that have been closed in error to be reopened.  

This means that sites will no longer have to escalate the ticket to the Help Desk, as now the Purchasing Supervisor has the ability to move the line (or even the entire GNS PO) back to the Received Partial status.

1. From the main menu in the client, go to Inventory > Purchasing > PO GNS Receipt.

2. Expand the Red Chevron in the search field.

3. Enter your PO number and click the green magnifying glass.

4. The PO will load.

In this case, the SCS has hit the CLOSE LINE button before she should have.  Because there is only one line on the PO, this closed both the line and the PO header.

5. Under the Goods and Service Tab, right next to the Close Line, people with the proper permissions will see the Reopen Line button.

6. A confirmation message appears in the lower right of the screen.

7. Click the X to close the message.

8. The Line (and header) is now at Received Partial.  

9. An Event tracks the reopening of the line.

From here, you can continue to receive as usual.

0 Comments

Add your comment

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Previous Article 2.6 In checking the Events Tab, I got a Failure Message that the PO was NOT created in SAP. It looks fine in EFP. What do I do?
Next Article 2.8 How do I cancel a duplicate line on a PO?