Steps in the screenshots correspond to the numbers in the headings.
As the PO bundling process happens before the Buyer posts the PO, there is nothing that really changes in the bundling process or the EDI Posting process.
If the site happens to use Alternative Addresses in the system to ship to different plants or warehouses, you will only be able to bundle reqs that have the same address. This is true whether that is an alternate address or the default address. You will not be able to continue bundling until all the reqs have matching addresses.
In our example, we have two requisitions for Site 493 that have an EDI vendor (SU10003992) set up as the Preferred Supplier in the Stock Record. Two reqs have generated that need to be bundled.
You can see that, although this is an EDI Vendor Partner, nothing has happened with the PO yet, so it is in a Proposed Status, the Approval Status is Pending, and the EDI Workflow is blank.
Remember, you need to bundle the Requisition numbers not the PO number.
0 Comments
Add your comment